Some projects demand fast response and proven capabilities, like this one. August Winter & Sons had field crews on site within hours after the customer called about a problem with two large stacks. A plan was then developed to fabricate the 1/2" thick, 10' diameter stack sections at our shop while crews removed the old stacks and prepared for the new installation. As a result, the repair work was completed in record time.