Project Filter

Wausau WWTP Digester Cover Replacement

Wausau, WI

Architect/Engineer

Becher Hoppe Associates, Inc.

Overview

 

This project required August Winter to remove and replace existing 65-foot diameter floating digester cover into a new fixed cover. The new fixed cover was to be fabricated and installed which included painting and insulation. Project also involved repairs for the plant’s existing 40-foot diameter ASME gas holding sphere. The WWTP needed to be fully functional during construction and installation of the new digester cover.

Project Included:

  • Fabrication
  • Service and Controls
  • Certified Welders
  • Equipment Fabrication
  • Equipment Installation
  • Pipe Fabrication and installation
  • Crane Services