Project Filter

Lodge Kohler

Ashwaubenon, WI

Overview

 

August Winter installed the HVAC and plumbing systems for a hotel located in the Titletown Development area. The building is an AAA, 4-diamond rated hotel with 144 luxury rooms and suites located just west of the football stadium. With the latest plumbing fixtures from Kohler being showcased, careful planning and install measures were taken to limit possible damage. Systems and fixtures were successfully installed to meet an aggressive schedule for grand opening.